{"id":2665,"date":"2022-04-04T18:38:20","date_gmt":"2022-04-04T21:38:20","guid":{"rendered":"https:\/\/transformadoresuniao.com.br\/?p=2665"},"modified":"2022-04-04T18:38:22","modified_gmt":"2022-04-04T21:38:22","slug":"preventive-maintenance-of-dry-transformers","status":"publish","type":"post","link":"https:\/\/transformadoresuniao.com.br\/en\/manutencao-preventiva-do-transformador-a-seco\/","title":{"rendered":"Dry transformer preventive maintenance"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">All transformers require continuous inspection to ensure the proper functioning of the equipment. And the <\/span><a href=\"https:\/\/transformadoresuniao.com.br\/en\/dry-transformer-what-it-is-and-what-are-its-advantages\/\"><span style=\"font-weight: 400;\">electrical transformers<\/span><\/a><span style=\"font-weight: 400;\">, which are used in the generation and distribution of energy for industries, hospitals, airports, and cinemas, are no different. However, it's worth highlighting that they require specific tests, which allow for the prevention of unscheduled shutdowns, extending the equipment's lifespan, and forecasting maintenance needs, thereby reducing the downtime. Do you know how preventive maintenance for dry-type transformers is performed? Understand below the <\/span><a href=\"https:\/\/transformadoresuniao.com.br\/en\/learn-about-routine-tests-on-dry-type-transformers\/\"><span style=\"font-weight: 400;\">routine tests<\/span><\/a><span style=\"font-weight: 400;\">, according to Brazilian standards (ABNT \u2013 NBR 5356).<\/span><\/p>\n<p><!--more--><\/p>\n<p><span style=\"font-weight: 400;\">Learn how preventive maintenance is performed on dry-type transformers<\/span><\/p>\n<p><span style=\"font-weight: 400;\">As previously mentioned, the goal of preventive maintenance is to assess the equipment, understanding its integrity and potential for failure. This is done through various tests that compare the equipment's results with factory (design) data and in accordance with Brazilian standards. Check out the step-by-step process below.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Site inspection and cleaning<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Analysis of the transformer installation site, visual inspection of the equipment, temperature check, and cleaning of air inlets and outlets.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Noise presence check<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Monitoring of the sounds produced by the equipment and comparison with the expected in the project.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Turns ratio test<\/span><span style=\"font-weight: 400;\"><br \/><\/span><span style=\"font-weight: 400;\">Its purpose is to ensure that the number of turns between windings is in accordance with the design. This ensures that the input and output voltages are maintained within a range of plus or minus 0.5% between the actual and designed values.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Ohmic resistance test of windings<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The essay aims to <\/span><span style=\"font-weight: 400;\">Analyze possible interruptions or connection and contact issues. It performs this diagnosis <\/span><span style=\"font-weight: 400;\">\u00a0when comparing the calculated values as ideal in the equipment design versus the values measured on it.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Insulation resistance test<\/span><span style=\"font-weight: 400;\"><br \/><\/span><span style=\"font-weight: 400;\">The objective is to verify the solid insulation levels of transformers between windings and ground, which can be compromised due to the presence of dust, moisture, and material degradation.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Applied Stress Test<\/span><span style=\"font-weight: 400;\"><br \/><\/span><span style=\"font-weight: 400;\">This involves applying a specific voltage to the equipment at intervals determined by the standard. During the process, to ensure the transformer is functioning as expected, there must be no insulation breakdown.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Induced Tension Test<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The test consists of applying double the nominal voltage, with a frequency of at least 120Hz for the time calculated by the standard. During this period, there should be no disruptive discharges. If they occur, the equipment requires maintenance.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">No-load test and excitation current<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Perform loss measurements through nominal voltage and frequency, and compare the obtained values with the design and standard.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Are you looking for a qualified company to perform preventive maintenance on dry-type transformers? Transformadores Uni\u00e3o's laboratory has modern, calibrated, and prepared equipment to <\/span><a href=\"https:\/\/transformadoresuniao.com.br\/en\/services\/\"><span style=\"font-weight: 400;\">validate medium and low voltage transformer tests<\/span><\/a><span style=\"font-weight: 400;\">, as required by ABNT standards. Contact us! <\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u00a0<\/span><\/p>\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Todos os transformadores exigem inspe\u00e7\u00e3o cont\u00ednua, para garantir o bom funcionamento do equipamento. E os transformadores el\u00e9tricos, que s\u00e3o utilizados na gera\u00e7\u00e3o e distribui\u00e7\u00e3o de energia para ind\u00fastrias, hospitais, aeroportos e cinemas, n\u00e3o s\u00e3o diferentes. Mas vale destacar que exigem testes espec\u00edficos, que\u00a0 permitem evitar paradas n\u00e3o programadas, aumentar a vida \u00fatil do equipamento, al\u00e9m [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2579,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-2665","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-transformadores"],"_links":{"self":[{"href":"https:\/\/transformadoresuniao.com.br\/en\/wp-json\/wp\/v2\/posts\/2665","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/transformadoresuniao.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/transformadoresuniao.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/transformadoresuniao.com.br\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/transformadoresuniao.com.br\/en\/wp-json\/wp\/v2\/comments?post=2665"}],"version-history":[{"count":1,"href":"https:\/\/transformadoresuniao.com.br\/en\/wp-json\/wp\/v2\/posts\/2665\/revisions"}],"predecessor-version":[{"id":2666,"href":"https:\/\/transformadoresuniao.com.br\/en\/wp-json\/wp\/v2\/posts\/2665\/revisions\/2666"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/transformadoresuniao.com.br\/en\/wp-json\/wp\/v2\/media\/2579"}],"wp:attachment":[{"href":"https:\/\/transformadoresuniao.com.br\/en\/wp-json\/wp\/v2\/media?parent=2665"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/transformadoresuniao.com.br\/en\/wp-json\/wp\/v2\/categories?post=2665"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/transformadoresuniao.com.br\/en\/wp-json\/wp\/v2\/tags?post=2665"}],"curies":[{"name":"WordPress","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}