How is an electrical transformer manufactured?

Here on the Transformadores União Blog, we've already discussed the function of transformers in power generation and distribution, which is to step down or step up voltage levels according to necessity. 

With such an important role in an operation as essential as power supply, this equipment needs to be of high quality, so that it meets all ABNT and electric power utility standards. And to choose the best options on the market, it's essential to understand how the equipment is manufactured. Check it out below! 

Manufacture of Electrical Power Transformers

Step 1: Core Cut

An image containing a building, road, truck, parkedAutomatically generated description

Through specific equipment, silicon steel blades with high magnetic permeability are cut with great precision according to the project's needs. This cutting can be done in various ways, such as 90° cuts, 45° cuts (step-lap), among others.

Stage 2: Core Assembly

Black cameraPhoto description automatically generated with low confidence

The silicon steel laminations are stacked on specific tables, using jigs, according to the project's definition, and assembled with a metal structure, which ensures their compaction and support.

Stage 3: Coil Production

An image containing a keyboard, desk, close-up

Medium and low voltage coils: They are produced with high efficiency and precision machines, using aluminum or copper sheets or wires, with specific insulating material, as defined in the project.

An image featuring a front, pink, sign, standing.

In dry-type transformers, after the medium-voltage coils are produced, they are sent to the vacuum encapsulation system using high-performance epoxy resin, ensuring the efficiency of solid insulation.

Step 4: Assembly Line 

Birthday Cake
Auto-generated description with medium confidence

At this stage, with the components prepared (cores, coils, etc.), the fitting of the medium and low voltage coils onto the magnetic core begins, and subsequently, the installation of accessories is carried out according to the client's needs.

Stage 5: Testing

An image containing Lego, toy, snow, skiAutomatically generated description

After the transformer assembly is completed, it is subjected to essays, according to the current ABNT NBR standard, of routine and type (when requested).

The best transformers for your operation

Completely Brazilian and with over 30 years of experience, Transformadores União offers medium and low voltage transformers that meet the specific needs of your operation, with respect for the environment and ensuring safe, continuous operation.